Please create an account to participate in the Slashdot moderation system

 



Forgot your password?
typodupeerror
Check out the new SourceForge HTML5 internet speed test! No Flash necessary and runs on all devices. ×

Submission + - HT Superconductors to build Grid Interconnect (yahoo.com)

physburn writes: Some big and cold is appearing in Clovis, New Mexico. Somewhere in a triangle between, Roswell (UFO), Alberqueue (Left Turn), and Armillo (Do you know the way), a 22.5 square mile, a triangle of High Temperature Superconductor pipeline is to be build. Each leg of the triangle can carry 5GW of electricity. The purpose to load balance and sell electricity between America's three power grids. Previously the Eastern Grid, Western Grid and Texan Grid have been seperate, preventing cheap electricity being sold from one end of America to the other. The Tres Amiga Superstation as it is to be called, will final contact the three grids. The superstation is also design to link renewable solar and wind power in the Grids, and is to use HTS wire from American Superconductor. Some 23 years after its invention today is day HTS came of age.
came of age.

This discussion was created for logged-in users only, but now has been archived. No new comments can be posted.

HT Superconductors to build Grid Interconnect

Comments Filter:

The only difference between a car salesman and a computer salesman is that the car salesman knows he's lying.

Working...