Follow Slashdot stories on Twitter


Forgot your password?
Take advantage of Black Friday with 15% off sitewide with coupon code "BLACKFRIDAY" on Slashdot Deals (some exclusions apply)". ×

Submission + - HT Superconductors to build Grid Interconnect (

physburn writes: Some big and cold is appearing in Clovis, New Mexico. Somewhere in a triangle between, Roswell (UFO), Alberqueue (Left Turn), and Armillo (Do you know the way), a 22.5 square mile, a triangle of High Temperature Superconductor pipeline is to be build. Each leg of the triangle can carry 5GW of electricity. The purpose to load balance and sell electricity between America's three power grids. Previously the Eastern Grid, Western Grid and Texan Grid have been seperate, preventing cheap electricity being sold from one end of America to the other. The Tres Amiga Superstation as it is to be called, will final contact the three grids. The superstation is also design to link renewable solar and wind power in the Grids, and is to use HTS wire from American Superconductor. Some 23 years after its invention today is day HTS came of age.
came of age.

This discussion was created for logged-in users only, but now has been archived. No new comments can be posted.

HT Superconductors to build Grid Interconnect

Comments Filter:

Numeric stability is probably not all that important when you're guessing.